![AC1](https://www.eurogv.si/wp-content/uploads/2018/09/AC1.jpg)
![AC2](https://www.eurogv.si/wp-content/uploads/2018/09/AC2.jpg)
![AC3](https://www.eurogv.si/wp-content/uploads/2018/09/AC3.jpg)
![01_tomiselj_720p1](https://www.eurogv.si/wp-content/uploads/2018/09/01_tomiselj_720p1.jpg)
![02_bizovik-details_720p](https://www.eurogv.si/wp-content/uploads/2018/09/02_bizovik-details_720p.jpg)
![03_bizovik-details_NEW_720p](https://www.eurogv.si/wp-content/uploads/2018/09/03_bizovik-details_NEW_720p.jpg)
Specifications | |
---|---|
CREW | 1+2 or 1+5 |
DRIVE | 6×2, 6×4, 6×6, 8×4, 8×8 |
SUPERSTRUCTURE | aluminium material |
WATER TANK | 10.000 L – 28.000 L |
FOAM TANK | 1.000 L – 2.000 L |
WATER AND FOAM MONITOR CAPACITY | 3.600 L – 5.000 L/10 bar |
PUMP | 3.000 L – 5.000 L/10 bar and 400 L/40 bar |
HOSE REEL | 60 m with nozzle |
EQUIPMENT | hoses, nozzles, electrical equipment, breathing apparatures |