![TLF5000-1](https://www.eurogv.si/wp-content/uploads/2018/09/TLF5000-1.jpg)
![TLF5000-2](https://www.eurogv.si/wp-content/uploads/2018/09/TLF5000-2.jpg)
![TLF5000-3](https://www.eurogv.si/wp-content/uploads/2018/09/TLF5000-3.jpg)
![01_topoliscica_720p](https://www.eurogv.si/wp-content/uploads/2018/09/01_topoliscica_720p.jpg)
![02_topoliscica_720p](https://www.eurogv.si/wp-content/uploads/2018/09/02_topoliscica_720p.jpg)
![03_topoliscica_720p](https://www.eurogv.si/wp-content/uploads/2018/09/03_topoliscica_720p.jpg)
Specifications | |
---|---|
CREW | 1+2 or 1+5 |
DRIVE | 4×2 or 4×4 |
SUPERSTRUCTURE | aluminium material |
LIGHT TOWER | 4 x 1.000 W or Xenon 24 V |
WATER TANK | 5.000 L – 10.000 L |
FOAM TANK | 500 L |
WATER AND FOAM MONITOR CAPACITY | 2.400 L – 3.200 L at 10 bar |
PUMP | 3.000 L/10 bar and 400 L/40 bar |
HOSE REEL | 60 m with nozzle |
EQUIPMENT | hoses, nozzles, electrical equipment, power generator, breathing apparatures |